Cover image RLC in Kireka – Kampala, Uganda | Photo credit by Lenard Sangaalo

Emma Nabirye
I am a Civil Engineer, Measurement Engineer and Road Safety Officer at Uganda’s Ministry of Works and Transport. With over eight years of experience in engineering consultancy and road infrastructure projects, I bring expertise in construction management, project planning and quality management. As an IRF-certified Road Safety Auditor, I am committed to advancing road safety and quality infrastructure delivery in Uganda
Road User Behaviour at Railway Level Crossings
Over time, road accidents have been looked at in terms of collisions involving vehicles only or collisions between vehicles and pedestrians, cyclists and roadside hazards. One area that has not received much attention is the collisions which occur at Railway Level Crossings (RLCs) – the points where road and rail traffic intersect. It is where the train is moving along the railway tracks at a high speed, the motorist on the road may be driving at a high speed, the cyclist who is in a such a hurry is riding at a high speed and ignores the hand signals from crossing guards, and the pedestrian is not aware of where and when to cross at the RLC. These are areas which are creating challenges in ensuring the safety of both the road and rail users.
I have seen this safety challenge just recently in July 2026 when a passenger train collided with a high-speeding school bus at Namumira Railway Level Crossing along Katosi road in Mukono district in Uganda, leading to one fatality and several injuries sustained by the children. The driver of the school bus was moving at high speed and attempted to cross the railway tracks despite instructions or warnings to stop from traffic personnel at the crossing. This is one of the many accidents that have occurred on RLCs in Uganda.
One observation I have made is that how the road users perceive the RLC environment plays an important role in enhancing safety at the RLC and determines whether the road user will approach with caution or not. This safety concern has received limited attention yet the effects of the occurrences are very detrimental.

The Gap is Largely Human Behaviour
The problem is that the available data hardly accounts for the collisions at road-rail intersections. The 2025 Kampala Road Safety Report highlights that 407 people died in road crashes in Kampala during 2025, a slight increase from 404 in 2024, and that 2,993 people sustained serious injuries. However, the specific RLC collisions are not stated.
According to the World Health Organization (2023), approximately 1.19 million road traffic deaths occurred in 2021 of which 92% of these occur in low- and middle-income countries. The Africa Transport Policy Program (SSATP) (2025) highlights that road traffic deaths in Africa are about 24% of the global road traffic deaths, and that fatalities due to crashes at level crossings account for about 1% of all global road fatalities.
While this percentage of fatalities at RLCs appears too small, it is measured at locations which also represent a relatively small portion of the road network. This implies that the magnitude of the problem is actually higher than we think. More so, the outcomes of the collisions are often catastrophic, with the chances of fatalities in numerous accidents being almost ten times greater than those in road incidents (Ladich & Miletics, 2025). This can be attributed to the heavy weight of trains and their constant high speeds, which prevent them from stopping in time to allow road users cross when the train is close to the RLCs.
Railways Africa (2026) highlights that the key factor contributing to these collisions is human behaviour, and results from drivers not observing the highway code. Similarly, a safety and risk analysis conducted at railway crossings of North – South Addis Ababa Light Rail in Ethiopia reveal that human factors are the leading cause of accidents at RLCs in Addis Ababa (Sekasi & Solihu, 2021). Many fatalities and injuries have been recorded although comprehensive data is scarce across the continent, but available reports reveal a persistent risk. The available findings reveal that the key contributory factors are human behaviour and the physical characteristics of the crossings.

The Change We Need
We need to look at the RLC environment which ultimately affects how road users will approach the crossing. The United Nations Economic Commission for Europe (UNECE) 1968 Vienna Convention on Road Traffic (Article 19) and standard highway and railway operating principles emphasise that trains have absolute priority at level crossings and clearly set out the specific behavioural rules for all road users when approaching and going through a level crossing.
In line with this, Uganda has developed specific technical manuals, safety regulations, and project-based specifications that govern the design and management of railway level crossings. The Ministry of Works and Transport also outlines road and rail interface guidelines, including specific regulations under the Roads (Management of Public Roads) Regulations of 2026, which explicitly cover railway level crossings and requires road authorities and project agents to ensure traffic safety and comply with prescribed engineering manuals during road implementation. However, implementation and installation of safety infrastructure during road and rail projects faces significant gaps and delays. Also, many level crossings especially across Kampala, Wakiso, and Mukono lack standard engineering controls like boom gates, flashing lights, and proper advance road markings. This greatly affects human behaviour.
Safe Road Users being one of the pillars of the Safe System Approach, gathering comprehensive crash data, having self-explaining engineering controls, and public education can be a big step in the right direction.
- The Questions Worth Asking
Whereas in Uganda, the Uganda Railways Corporation (URC) launched the “Safe Tracks. Safe Roads. Safe Lives” campaign in partnership with the Ministry of Works and Safe Way Right Way in August 2026, there are pertinent questions we need to ask: Is there specific crash data relating to RLC collisions? Are the crossings well designed and implemented as per the designs and regulations? Are the road users sensitised about the RLC safety risks?
I believe that this will provide a starting point in effectively addressing the root cause of the human behaviour at RLCs, and as the railway network expansion continues in Uganda, with the construction of the Standard Gauge Railway in progress, appropriately addressing this safety challenge will ensure safer road users and reduction in fatalities, making RLCs a safe spot.
Africa Transport Policy Program (SSATP). (2025). Africa Status Report on Road Safety. Washington DC: Africa Transport Policy Program (SSATP).https://www.ssatp.org/publication/africa-status-report-road-safety-2025
Anagnostopoulos, A. (2025). Assessing Safety and Infrastructure Design at Railway Level. Future Transp, 5-24.https://www.mdpi.com/2673-7590/5/1/24
Ladich, M., & Miletics, D. (2025). Adaptation of road safety inspection method to railway level crossings. Pollack Periodica An International Journal for Engineering and Information Sciences, 39–45.https://www.akjournals.com/view/journals/606/20/1/article-p39.xml
Railways Africa. (2026, August 27). Retrieved from Safety At Level Crossings, A Global Issue: https://www.railways.africa/safety-at-level-crossings-a-global-issue/
Sekasi, J., & Solihu, H. (2021). Safety and risk analysis at railway crossings of north-south Addis Ababa light rail. Smart and Resilient Transport, 266-282.https://www.emerald.com/srt/article/3/3/266/345252/Safety-and-risk-analysis-at-railway-crossings-of
World Health Organization. (2023). Global Status Report on Road Safety. Geneva: World Health Organization.https://www.who.int/teams/social-determinants-of-health/safety-and-mobility/global-status-report-on-road-safety-2023
MORE NEWS
October 14, 2026
0 Comments2 Minutes
Transforming a National Highway into a Safer, More Inclusive Urban Street
A conversation with Richard Neumann, Senior Manager Communications and Events, SWARCO Group, Austria.
October 14, 2026
0 Comments2 Minutes
Understanding How Corridors Can Deliver
A conversation with Richard Neumann, Senior Manager Communications and Events, SWARCO Group, Austria.
October 12, 2026
0 Comments13 Minutes
Right to Walk Before Right to Drive
A conversation with Richard Neumann, Senior Manager Communications and Events, SWARCO Group, Austria.
October 12, 2026
0 Comments10 Minutes
The Economics of Inclusive Mobility
A conversation with Richard Neumann, Senior Manager Communications and Events, SWARCO Group, Austria.
October 12, 2026
0 Comments8 Minutes
Rigid Crash Barriers May Not Deflect. Vehicles Do.
A conversation with Richard Neumann, Senior Manager Communications and Events, SWARCO Group, Austria.
October 12, 2026
0 Comments11 Minutes
After the Licence
A conversation with Richard Neumann, Senior Manager Communications and Events, SWARCO Group, Austria.








